DraftlyFree property checks › Free flood check
Free flood check

Check Flood Risk for Any Australian Address — Free

Type an address and Draftly reads the flood overlays your council and state actually publish — then hands you the whole site brief, not a teaser. No account, no per-report fee, no sales call.

Free, no account, not metered. Runs the full site brief — zone, overlays, verified lot boundary, easements and design wind — and gives you the PDF.

What you get back

Every free brief returns the whole picture — not just the one line you came for. (Your check lands in the brief's Overlays & Controls — flood section.)

Free here, billed per report elsewhere

Typical per-address pricing elsewhere in the Australian property-data market, against what the Draftly site brief includes.
CheckProperty-data platformsDraftly site brief
Flood report $39–$69 Free
Bushfire pre-screen $39–$69 Free
Planning PDF around $9 Free
Geotechnical desktop study around $119 Free
State heritage certificate $63.04 Free

Source: Draftly's public comparison audit, last updated 2026-08-12 — the same figures shown at /compare/. Figures are point-in-time and describe the property-data category generally, not any one named vendor; verify current pricing with the vendor. A state heritage certificate fee is set by the state heritage body.

Flood is the constraint most likely to change what a backyard build costs — and the one most people discover last, usually from a council officer after the design is already drawn.

The information itself is public. Every Australian state publishes flood-related planning overlays, and many councils expose them through open-data services. The problem has never been secrecy; it is that the data lives in a different portal in every jurisdiction, under a different name, behind a map interface built for a desktop browser in 2011. Finding out whether a Land Subject to Inundation Overlay touches your lot can genuinely mean trawling a planning scheme PDF and a schedule.

That gap is why a market grew for paid per-address flood reports. They are selling aggregation and convenience over free government data — a reasonable business, and a real cost to anyone checking more than one site.

What Draftly does differently

Draftly reads the same government services and returns the flood overlays alongside everything else the site brief carries: the zone, your verified lot boundary from the cadastre, easements, design wind region and nearby DA activity. It arrives in one pass, on one screen, on a phone, in about the time it takes to type the address.

It is free because the research is not what Draftly sells. The paid work is downstream — turning the answer into an engineered, documented, lodgement-ready structure.

What it will not do

It will not issue a flood certificate, model a flood level, or replace a catchment authority referral. Where a government service does not publish a layer for an address, the brief says the layer is unavailable rather than implying the site is clear. Every figure in the brief is named with its source so you can check it against the portal it came from.

How Draftly compares

DimensionDraftlyCanibuildBuildertrend / CoConstructArchistarProperty-data platformsClearCalcsCouncil & state portals
Address-to-answer speedType an address → a useful answer, with nothing in between.45144.51.51
Planning data reliabilityHow much of the planning answer is real government data vs inference.4414.5415
Visual UXMap, drag-and-drop, live feedback — how it feels to use.453.5433.51
Drafting & exportDrawings, DXF/PDF sets, documents a council or certifier accepts.4.521.5112.51
Engineering defensibilityStructural calculations, member schedules, AS/NZS-referenced outputs.421114.51
Commercial readinessPricing clarity, payments, onboarding, market maturity.3.53.54.543.53.5
Partner / trade ecosystemPartner programs, integrations, API access, white-label.4.533.52.5221
Running the buildSchedule of works, trade dispatch, purchase orders, and what the homeowner can see.31.54.5111
What you get before payingHow much of a usable answer arrives without a subscription, a per-report fee, or a sales call.511.51.52.523

Scores are calibrated for ONE job: the address-to-permit-to-built workflow for Australian backyard structures and small residential builds (pergolas, decks, sheds, carports, granny flats) — for trades, builders and homeowners. They are not a verdict on general construction software. A tool can score low here and be excellent at what it is actually built for.

Scored 1–5. “—” means the dimension does not apply to that product. Last updated 2026-08-12. See the full comparison · Report an error.

Where Draftly is weak

This table is an audit, not a brochure. These are our own limitations, published because a comparison that only flatters us is worth nothing.

  • Planning zones come live from government APIs in 5 states/territories (VIC, NSW, QLD metro councils, TAS, ACT). SA is answered from a shipped snapshot of the PlanSA zones layer (~3 m simplified), not a live call, because SA has no public point-query service — the brief says so on the result rather than showing a fetch time that would imply otherwise. WA/NT and full per-state overlay completeness are still gaps; uncovered lookups fall back to guided manual entry, never a fabricated answer
  • Hazard depth is thinner than the dedicated property-data platforms. Heritage is queried in all six wired jurisdictions and acid sulfate soils across the NSW councils that publish them; bushfire and flood are wired where a government service exposes them. Noise, school catchment and soil hazards outside NSW are not aggregated nationally
  • AI is used only for extracting details from documents you upload and for the help assistant — never for planning data (address research is a pure government-API lookup)
  • Draftly Works is new. The schedule, gates, orders and claims are built and tested, but no build has yet been run end to end on it by a customer
  • Purchase orders and progress claims exist as tested engines with database rules behind them, and neither has a screen in the app yet. Xero sync is not connected either — so a purchase order will be a record in Draftly until both land
  • A stage completion asks for a photo and a readiness checklist. The gate is enforced; the photo file itself is not stored yet, so the evidence is a prompt rather than a record
  • The dependency cascade — recalculating downstream dates when a stage runs late, and naming which trades are affected — is built and tested, but the schedule screen still shows the baseline plan. It does not yet move dates on you
  • Billing handles the happy path: new subscriptions, upgrades and cancellations. A failed card or a refund is not yet reflected automatically in the product — those are handled by hand in Stripe today
  • Commercial maturity lower than the volume-builder platforms — live payments and a subscriptions interface shipped 2026-08-04, but still pre-public-launch
  • Mobile UX still being polished (Section-3 site-design rework in progress)

Questions

Is this a certified flood certificate?
No. This is a planning-overlay screen, not a statutory flood certificate. It tells you which flood overlays a government service publishes for the address, so you know before you pay anyone whether flood is going to shape your build. For a formal flood level or a certificate for lodgement, your council or catchment authority is the issuing body.
What data source does the flood check use?
State and council planning services — the same government APIs and registers the planning scheme itself is published from. Draftly does not infer or model flood risk, and it does not use AI for planning data. Where a government service does not expose a layer for an address, the brief says so rather than guessing.
Does a flood overlay mean I cannot build?
Usually not. A flood overlay generally means an additional planning permit trigger and design conditions — minimum floor levels, materials, or referral to the catchment authority — rather than a prohibition. What it reliably means is that the approval pathway is longer and the design constraints are real, which is exactly what you want to know before you commit.
Do I need an account to run the check?
No. The site brief is free and needs no account, and nothing about the research step is metered — no per-report fee and no lookup cap.
Which states are covered?
Planning zones are live via government APIs across six states and territories — VIC, NSW, QLD metro councils, TAS, SA and ACT. WA and NT, and full per-state overlay completeness, are still gaps. Where a lookup is not covered, Draftly falls back to guided manual entry rather than returning a fabricated answer.
How is this free when other tools charge per report?
The site brief is the front of a funnel, not the product. Draftly earns from the work downstream — the engineered design, the drawing set and the lodgement package. Giving the research away costs us a government API call; charging for it would cost us the customer.

Check something else on the same address

Run it now

Free, no account, not metered. Runs the full site brief — zone, overlays, verified lot boundary, easements and design wind — and gives you the PDF.